Difference between revisions of "Integration"

From ATHENA collaboration
Jump to navigation Jump to search
 
Line 19: Line 19:
 
* [[Baseline+_Configuration|Baseline+]] (B-1.0, P-1.0, N-1.0)
 
* [[Baseline+_Configuration|Baseline+]] (B-1.0, P-1.0, N-1.0)
 
* [[Baseline2_Configuration|Baseline 2]] (B-2.0, P-2.0, N-2.0)
 
* [[Baseline2_Configuration|Baseline 2]] (B-2.0, P-2.0, N-2.0)
 
* [https://wiki.bnl.gov/athena/index.php/Baseline_Configuration Baseline]  (B-0.0, P-0.0, N-0.0)
 
* [https://wiki.bnl.gov/athena/index.php/Baseline+_Configuration Baseline+] (B-1.0, P-1.0, N-1.0)
 
* [https://wiki.bnl.gov/athena/index.php/Baseline2_Configuration Baseline 2] (B-2.0, P-2.0, N-2.0)
 
  
 
== Important Information from the Project ==
 
== Important Information from the Project ==

Latest revision as of 16:22, 26 October 2021

Welcome to the Wiki page of the Detector Concept/Integration Committee.

Committee

Members of the Committee are:

  • Silvia Dalla Torre (INFN Trieste, Italy): Silvia.DallaTorre@ts.infn.it (contact person)
  • Alexander Kiselev (BNL, USA): ayk@bnl.gov
  • Franck Sabatie (Saclay, France): Franck.Sabatie@cea.fr
  • Bedangadas Mohanty (NISER, India): bedanga@niser.ac.in
  • Thomas Ullrich (BNL, USA): thomas.ullrich@bnl.gov

Project Contact / Liaison: Elke Aschenauer (BNL): elke@bnl.gov

Current Configurations

Explanation of configuration labels can be found here. The names associated with the exact labels are simply common short names to describe the configuration combination.

Important Information from the Project

Many important pieces of information concerning beams, IR, magnet, and engineering are provided by the project and available on the Project pages.

Subsystem Spec Sheets (DWG)

  • TBD

Validation Results (PWG)