Difference between revisions of "Results (Polarimetry)"

From RHIC Spin Group
Jump to navigationJump to search
m
Line 5: Line 5:
 
<span class="s125">'''A document describing the Run9 (100 GeV), Run11 and Run12 results is report number C-A/AP/490 at [http://public.bnl.gov/docs/cad/Documents/RHIC%20polarization%20for%20Runs%209-12.pdf [1]].'''</span><br/><span class="s125">'''The report should be cited with "RHIC Polarimetry Group" as author.'''</span>
 
<span class="s125">'''A document describing the Run9 (100 GeV), Run11 and Run12 results is report number C-A/AP/490 at [http://public.bnl.gov/docs/cad/Documents/RHIC%20polarization%20for%20Runs%209-12.pdf [1]].'''</span><br/><span class="s125">'''The report should be cited with "RHIC Polarimetry Group" as author.'''</span>
  
<span class="s125">'''The final results tables referred to in the document are accessed through the 'Fill by fill results' links below for the different years Runs 9-13'''</span>
+
<span class="s125">'''The final results tables referred to in the document are accessed through the 'Results' links below for the different years Runs 9-17'''</span>
  
 
----
 
----
Line 21: Line 21:
  
 
|  
 
|  
'''[[Run_15_polarization|Results]]'''<br/>
+
'''[[Run_15_polarization|Results]]'''<br/>[https://wiki.bnl.gov/rhicspin/upload/e/e4/Pol_resultsMay2016.pdf Analysis Note]
[https://wiki.bnl.gov/rhicspin/upload/e/e4/Pol_resultsMay2016.pdf Analysis Note]
 
  
 
|  
 
|  
'''[[Run_13_polarization|Results]]'''<br/>
+
'''[[Run_13_polarization|Results]]'''<br/>[https://wiki.bnl.gov/rhicspin/upload/e/e4/Pol_resultsMay2016.pdf Updated Analysis Note]<br/>[https://wiki.bnl.gov/rhicspin/upload/8/8c/Polar_Run13_update.pdf Old Analysis Note]
[https://wiki.bnl.gov/rhicspin/upload/e/e4/Pol_resultsMay2016.pdf Updated Analysis Note]<br/>[https://wiki.bnl.gov/rhicspin/upload/8/8c/Polar_Run13_update.pdf Old Analysis Note]
 
  
 
|  
 
|  

Revision as of 15:16, 3 August 2018


Final Results for RHIC polarized pp data analysis

A document describing the Run9 (100 GeV), Run11 and Run12 results is report number C-A/AP/490 at [1].
The report should be cited with "RHIC Polarimetry Group" as author.

The final results tables referred to in the document are accessed through the 'Results' links below for the different years Runs 9-17


Run-17 Run-15 Run-13 Run-12 Run-11

Results

Results
Analysis Note

Results
Updated Analysis Note
Old Analysis Note

Results

Results

Earlier polarization results

Run-09 Run-08 Run-06 Run-05 Run-03/04

Results (100 GeV)
Details (100/250 GeV)
Analysis note

Results
Details

Results
Analysis Note

Final Results
Analysis Note

Final Results 03/04
Analysis Note

More details at: http://www4.rcf.bnl.gov/~cnipol/

Info for experts:

A summary table with the average scale factors for the p-Carbon polarimeters for runs 9, 11, 12, and 13 is available on the PCarbon normalization page.


Run 13

p-Carbon Polarimeters H-jet Polarimeter
  • Silicon detector response study

Run 12

p-Carbon Polarimeters H-jet Polarimeter

Run 11

p-Carbon Polarimeters H-jet Polarimeter

Run 09

p-Carbon Polarimeters H-jet Polarimeter


Last modified by Schmidke on 3-08-2018