Run 9 configuration (p-Carbon)

From RHIC Spin Group
Revision as of 17:18, 14 June 2012 by Dmitri Smirnov (talk | contribs) (Created page with "{{LastRevision}} {{Timeline |before= Run 8 configuration |title= Run 9 configuration |y...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Last modified by Dmitri Smirnov on 14-06-2012


Run 8 configuration Run 9 configuration Run 11 configuration


Detectors

  • B2D has 2 Hamamatsu detectors installed in the 90-degree ports


Last modified by Dmitri Smirnov on 14-06-2012