Run 9 configuration (p-Carbon)

From RHIC Spin Group
Revision as of 17:18, 14 June 2012 by Dmitri Smirnov (talk | contribs) (Created page with "{{LastRevision}} {{Timeline |before= Run 8 configuration |title= Run 9 configuration |y...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigationJump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Last modified by Dmitri Smirnov on 14-06-2012


Run 8 configuration Run 9 configuration Run 11 configuration


Detectors

  • B2D has 2 Hamamatsu detectors installed in the 90-degree ports


Last modified by Dmitri Smirnov on 14-06-2012